亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

Home / News Type Content Tools: Save | Print | E-mail | Most Read | Comment
Last Leg of Work on Main Three Gorges Dam Wall
Adjust font size:

The final phase of concrete placement for the main part of the mammoth Three Gorges Dam started at 4:00 AM on Friday in the middle section of the Yangtze River, the longest in China.?

 

The work is due to finish on Saturday, which will mark the completion of the dam's main wall.?

 

The 185-meter-high and 2,309-meter-long dam, often compared to the Great Wall in scale, is the world's largest dam built with a total of 28 million cubic meters (m3) of reinforced concrete. The last placement involves 1,017.5 m3 of concrete.?

 

The dam's main wall will measure 184.8 meters in height. The remaining 0.2 meters has been reserved for building a highway on the top of the dam.??

 

Situated near the Xiling Gorge, the easternmost gorge of the Three Gorges, the Three Gorges Project is the largest water control project in the world.

 

 

Initially envisioned by Sun Yat-sen, the forerunner of China's democratic revolution, in 1918, the project underwent protracted discussion before it was approved by the National People's Congress (NPC), China's top legislature, in 1992.?

 

Launched in 1993, the Three Gorges Project, with an estimated investment of 203.9 billion yuan (US$25.2 billion), will have 26 generators with a combined generating capacity of 18.2 million kilowatts. The entire project is scheduled for completion in 2009 and will have a power-generating capability of 84.7 billion kwh of electricity annually.?

 

 

The Three Gorges, -- Qutang, Wuxia and Xiling Gorges -- extend for about 200 kms along the upper reaches of the Yangtze. They have become a popular world-class tourist destination noted for their beautiful natural landscapes and historical and cultural relics.?

 

Apart from generating clean energy, other functions of the landscape-altering mega project, with a designed water storage capacity of 39.3 billion m3, include harnessing floods and enhancing the shipping industry.?

 

A total of 1.13 million people have been relocated as a result of the project.?

 

(Xinhua News Agency May 19, 2006)

 

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- Gov't to Audit Three Gorges Dam Project
- Emergency Plan Urged for Three Gorges Dam
- Limit on Tourist Numbers at Three Gorges Dam
- China Showcases Success of Dam Resettlement
- Three Gorges Dam Becomes Popular Tourist Site
- Dam Project to Be Completed This Month
- 80,000 to Be Evacuated for Dam's Rising Water
- Three Gorges Reservoir's Water Level to Be Raised
- Checks on Bank of Dam Project
Most Viewed >>
- World's longest sea-spanning bridge to open
- Yao out for season with stress fracture in left foot
- 141 seriously polluting products blacklisted
- China starts excavation for world's first 3G nuclear plant
- Irresponsible remarks on Hu Jia case opposed 
- 'The China Riddle'
- China, US agree to step up constructive,cooperative relations
- FIT World Congress: translators on track
- Christianity popular in Tang Dynasty
- Factory fire kills 15, injures 3 in Shenzhen

Product Directory
China Search
Country Search
Hot Buys
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码