亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

Home / Business / Energy Tools: Save | Print | E-mail | Most Read | Comment
China earmarks US$7.9b for water diversion project
Adjust font size:

China earmarked 53.87 billion yuan (7.9 billion U.S. dollars) for the country's huge south-to-north water diversion project as of the end of April, head of the project office Zhang Jiyao said Saturday.

The figure was 8.2 billion yuan more than the end-of-November figure of 45.67 billion yuan, the last time when such figure was announced.

China's South-to-North Water Diversion Project is designed to divert water from the water-rich south of the country, mainly the Yangtze, or the country's longest river, up to the dry north.

The earmarked money is from budgeted spending from the central government, at 15.42 billion yuan, special funds in treasury bonds from the central budget, at 10.65 billion yuan, funds of local governments, at 7.99 billion yuan, and loans, at 19.81 billion yuan.

Zhang said several key projects along the eastern route have been completed. The Danjiangkou Dam in central China's Hubei Province, the source of diverted water along the central route, is still under construction.

The huge water diversion project consists of eastern, central and western routes. The eastern and central routes are already under construction, while the western route, meant to replenish the Yellow River with water from the upper reaches of the Yangtze through tunnels in the high mountains of western China, is still at the planning stage.

China's State Council has allowed an investment of up to 254.6 billion yuan (about 37.2 billion U.S. dollars) for the phase-one projects along the eastern and middle routes.

Zhang said 30.48 billion yuan, part of the earmarked 53.87 billion yuan, had been spent, with 5.66 billion yuan on the eastern route and 24.82 billion yuan on the middle route.

A 225-kilometer canal linking Shijiazhuang City of Hebei Province to Beijing has started pumping water into the capital as of Sept. 28 to ease the city's water shortage.

The canal is designed to divert up to 300 million cubic meters of water annually. It has so far pumped 190 million cubic meters of water into Beijing as of May 6.

Construction on the eastern route began in December 2002, and on the central route in December 2003.

The eastern route is expected to be ready for water diversion to Jiangsu and Shandong provinces in 2013, and the central route would be ready to pump water into Beijing in 2014, according to latest estimation of the project office.

(Xinhua News Agency May 23, 2009)

Tools: Save | Print | E-mail | Most Read Bookmark and Share
Comment
Pet Name
Anonymous
China Archives
Related >>
May 7-8 Brussels China-EU high-level trade talks

May 17-22 Hong Kong Heilongjiang-Hong Kong Trade Cooperation Seminar
- Output of Major Industrial Products
- Investment by Various Sectors
- Foreign Direct Investment by Country or Region
- National Price Index
- Value of Major Commodity Import
- Money Supply
- Exchange Rate and Foreign Exchange Reserve
- What does the China-Pakistan Free Trade Agreement cover?
- How to Set up a Foreign Capital Enterprise in China?
- How Does the VAT Works in China?
- How Much RMB or Foreign Currency Can Be Physically Carried Out of or Into China?
- What Is the Electrical Fitting in China?
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码