亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

m.keyanhelp.cn

China-built Nuclear Plant Runs at Full capacity


Late Friday evening, the No.1 reactor of the second phase project at the Qinshan Nuclear Power Plant, which was independently designed and built by China, reached its critical capacity for the first time.

The nuclear plant, the first such facility with a capacity of 600,000 kilowatts, is now able to join the national power grid and operate at full scale, according to official sources.

This means China's nuclear technology and civil nuclear power industries have entered a new stage, the sources stressed.

The second-phase project at Qinshan, in Haiyan County of east China's Zhejiang Province, started construction on June 2, 1996, with an investment of 14.8 billion yuan (US$1.8 billion). Qinshan Nuclear Power Plant was the first nuclear power plant built with China's own technology.

When the second-phase project begins to operate at full capacity June 1, 2002, it is expected to generate four billion kilowatt hours of electricity a year for the east China power grid.

(China Daily December 29, 2001)

In This Series

China to Develop Its Nuclear Sector

China's First Nuclear Plant Begins to Issue Regular Environmental Monitoring Results

References

Archive

Web Link



Copyright ? 2001 China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码