亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

Home / English Column / Environment / Environment -- What's New Tools: Save | Print | E-mail | Most Read
As Water Rises in Three Gorges Reservoir, So Does Garbage
Adjust font size:

The rising water in the Three Gorges reservoir will make it harder for workers to clean up floating garbage in the dam, said an official with the China Yangtze River Three Gorges Project Development Corporation on Thursday.

 

The severe drought in the past several months in the upper reaches of the Yangtze River, China's longest, reduced its capacity to clean itself. As a result, a lot of garbage has been left behind on the banks, Cao Guangjing, vice manager of the corporation, told Xinhua.

 

The garbage will end up floating in the huge reservoir as water levels rise to 156 meters to increase the hydroelectric potential of the dam, he said.

 

The water in the reservoir began to rise at 10:00 p.m. on Wednesday.

 

The reservoir will see a sharp increase of floating garbage in a short time as water levels are being raised by 21 meters, from 135 to 156 meters, Cao said.

 

"The increase is going to make clean up work much more difficult," Cao said.

 

Cao said the amount of floating garbage in the reservoir is expected to surpass 200,000 cubic meters.

 

The company has decided to use a special boat to clean up the garbage, but the vessel hasn’t been put into operations due to a lack of spare parts, he said.

 

The capacity of the boat is 300 cubic meters, the world's largest of its kind, Cao added.

 

When the water level reaches 156 meters, the Three Gorges Project will increase power production by 7.85 billion kw/hours annually, while water storage capacities will rise by 11 billion cubic meters, improving shipping conditions upstream. The reservoir currently holds 14 billion cubic meters of water.

 

The water level will rise from the current 135 meters to 148 meters by October 1 and then to 156 meters by mid-October after a break of two days for engineers to monitor the effects on the dam, which was completed in May.

 

Meanwhile, local governments in the dam area have begun a clean-up campaign, setting aside a budget of 4.6 million yuan (US$575,000) for it.

 

Six hundred workers, 208 boats and 58 motor vehicles in Chongqing municipality, have been mobilized to clear the affected areas and the Yangtze's 20 lesser tributaries, that have already dried-up, of tree branches, solid waste and farm debris, said Tang Jiali, deputy director of Chongqing Municipal Environmental Hygiene Bureau.

 

"If this rubbish is not cleared, it will be washed down into the reservoir, polluting the environment and endangering shipping," Tang said.

 

Costing some 203.9 billion yuan (US$25.5 billion), the Three Gorges Project will have a reservoir with a capacity of 39.3 billion cubic meters and produce 84.7 billion kw/h of electricity annually, when it is completed in 2009.

 

By April this year, 126 billion yuan (US$15.75 billion) had been spent on project construction. A total of 130 billion kwh of electricity has been generated since July 2003, earning the government 25 billion yuan (US$3.125 billion) in revenue.

 

(Xinhua News Agency September 22, 2006)

Tools: Save | Print | E-mail | Most Read

Related Stories
Huge Funds Embarked to Clear Three Gorges Dam
Damming the Yangtze's Polluters
 
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號(hào)
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码