亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Film in China
War on Poverty
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar
Dialing and
Postal Codes


Hot Links
China Development Gateway
Chinese Embassies
Info
FedEx
China Post
China Air Express
Hospitals in China
Chinese Embassies
Foreign Embassies
Golfing China
China
Construction Bank
People's
Bank of China
Industrial and Commercial Bank of China
Travel Agencies
China Travel Service
China International Travel Service
Beijing Youth Travel Service
Links
China Tibet Tour
China Tours
China National Tourism Administration

Beijing Subway to Be Renovated

The largest renovation project ever conducted on Beijing's 30-year-old subway system will begin this year.

 

The project will start this year. The investment will be 4.3 billion yuan (US$518 million), of which 3.7 billion yuan (US$445 million) are for the improvement of trains and facilities, and the remainder for the construction of an Automatic Fare Collection system.

 

The renovations include updating and replacing tracks, trains, signals, communication systems, power suppliers and other important facilities before 2008.

 

Replacing the tracks and building a ticket system will begin in July this year.

 

Old tracks with a total length of 52.2 kilometers will be replaced by new seamless steel tracks, which will effectively reduce the noise and make for a smoother ride.

 

 

The restoration work will be done at night, between 12:30 and 4 am, when the subway system is out of service, to ensure the regular operations won't be seriously disrupted. 

 

According to the plan, 180 trains now running on Line 1 and the Loop Line will be replaced by new air-conditioned ones.

 

After that, the minimum interval between two trains will be shortened from the current 3-plus minutes to 2.5 minutes, which is the international standard.

 

The AFC system construction is scheduled to be finished by 2007. By then, passengers will be able to transfer between all subway lines with a single transportation pass.

 

At present, four rail transportation lines are in service in the capital city: Line 1, the Loop Line, the City Train and the Batong Line.

 

About 1.5 million passengers use the subway system every day.

 

(CRI.com March 18, 2005)

 

Overcrowding the Norm as Subway Trains Hit Capacity
Beijing Has First Public-private Managed Subway
Beijing Metro Corp Sued Over Pay Toilets
Injured Passenger Sues Beijing Metro Corporation
Subway to Link Two Railway Stations
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码